	The contract for the licensed production of two craft was signed with Danyard (Denmark) in 1987, the object  being the construction of two large FAC(M)s of limited performance but high capabilities in the ant-ship and patrol roles. The planned total is 10 units. The eight Harpoons and good air defense capabilities make these quite decent little ships.